Get a quote

EOR / IOR

Frame the recovery question first, then scope the chemical evaluation against reservoir conditions, injectivity and the existing production system.

Scope
Chemistry + laboratory
Approach
Defined around your application

Chemical treatment vessels and injection pumps with a producing well in the distance

Frame the recovery question first, then scope the chemical evaluation against reservoir conditions, injectivity and the existing production system.

An evaluation built around a recovery objective.

Enhanced and improved oil recovery require a clear operating question. Bring reservoir and fluid information, the current injection or production approach and the limitation the program is intended to address. Matrix includes EOR / IOR within its chemical application areas.

Separate screening from field outcomes.

A laboratory observation supports a defined comparison under stated conditions. It does not, by itself, establish incremental production or a recovery factor. Agree what evidence is needed for the next decision, and how a field evaluation would be measured before expanding the program.

Service scope

Services for your application.

Reservoir and fluid context

Review available rock, brine and fluid information to identify relevant evaluation conditions.

Candidate chemistry

Discuss formulation requirements in relation to the recovery mechanism being investigated.

Compatibility and handling

Consider the existing chemical package, injection-water conditions and practical preparation requirements.

Pilot planning inputs

Define the question, observations and responsibilities required for a scoped field evaluation.

A path to pilot evaluation

How we support your project.

  1. Define the objective

    Identify the recovery limitation and available baseline information.

  2. Evaluate the options

    Agree sample requirements, test conditions and interpretation limits.

  3. Scope the next decision

    Connect findings to a defined field-evaluation or supply brief.

Chemical preparation tanks, pumps, and injection pipework at a production facility

Information for your enquiry.

  • Reservoir, fluid and brine information available.
  • Injection or production context and target question.
  • Previous studies and current chemical program.
  • Evaluation scope, timing and decision criteria.